Western trunk sewer: shallow conduit rehabilitation (Werribee)
Original TEI
$231.9m
Current TEI
$231.9m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
0.0 months
Original: Dec 2029
→ Dec 2029
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata