Waterways stormwater quality projects (statewide)
Original TEI
$183.0m
Current TEI
$295.1m
Cost Overrun
+$112.1m
+61.3%
Schedule Overrun
—
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata