Waterways condition projects (statewide)
Original TEI
$286.6m
Current TEI
$528.2m
Cost Overrun
+$241.6m
+84.3%
Schedule Overrun
—
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata