Water production and storage projects (statewide)
Original TEI
$1429.5m
Current TEI
$1900.5m
Cost Overrun
+$471.0m
+32.9%
Schedule Overrun
—
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata