Original TEI
$262.1m
Current TEI
$262.1m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.

Metadata