Original TEI
$108.2m
Current TEI
$131.0m
Cost Overrun
+$22.8m
+21.0%
Schedule Overrun
Original: Sep 2024
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.

Metadata