Original TEI
$428.6m
Current TEI
$421.3m
Cost Overrun
$-7.3m
-1.7%
Schedule Overrun
-9.0 months
Original: Jun 2026 → Sep 2025
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.

Metadata

The TEI has decreased by $6.996 million due to $6.600 million being reprioritised to the Preparing the Network for Next Generation Trams (metropolitan various) initiative and $0.396 million due to budgeted amounts being reclassified as operating instead of capital expenditure, in line with accounting standards.