The Alfred Hospital urgent infrastructure (Prahran)
Original TEI
$174.5m
Current TEI
$174.5m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
0.0 months
Original: Jun 2030
→ Jun 2030
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata