Original TEI
$142.0m
Current TEI
$180.3m
Cost Overrun
+$38.4m
+27.0%
Schedule Overrun
0.0 months
Original: Jun 2026 → Jun 2026
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.

Metadata