Original TEI
$237.2m
Current TEI
$237.2m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
0.0 months
Original: Jun 2025 → Jun 2025
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.

Metadata