Original TEI
$4140.0m
Current TEI
$4140.0m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
0.0 months
Original: Dec 2030 → Dec 2030
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.

Metadata

The TEI includes $2.000 billion of Commonwealth Government funding.