Original TEI
$2371.6m
Current TEI
$2371.6m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
9.0 months
Original: Jun 2025 → Mar 2026
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.