State Basketball Centre redevelopment (Knox)
Original TEI
$128.5m
Current TEI
$128.7m
Cost Overrun
+$0.3m
+0.2%
Schedule Overrun
—
Original: Sep 2024
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata