South Dynon Train Maintenance Facility Stage 2 (statewide)
Original TEI
$296.8m
Current TEI
$296.8m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
3.0 months
Original: Jun 2026
→ Sep 2026
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata