Original TEI
$121.8m
Current TEI
$121.8m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
33.0 months
Original: Sep 2023 → Jun 2026
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.