Sewer growth – other (metropolitan various)
Original TEI
$216.6m
Current TEI
$216.6m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
—
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata