Sewer – growth (metropolitan and regional various)
Original TEI
$686.8m
Current TEI
$106.0m
Cost Overrun
$-580.8m
-84.6%
Schedule Overrun
—
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata