School upgrades – growth for 2022 (metropolitan various)
Original TEI
$130.9m
Current TEI
$130.9m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
9.0 months
Original: Dec 2023
→ Sep 2024
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata