Road Maintenance and Renewal (statewide)
Original TEI
$1250.0m
Current TEI
$1091.3m
Cost Overrun
$-158.7m
-12.7%
Schedule Overrun
0.0 months
Original: Jun 2033
→ Jun 2033
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata