Regional rail sustainability (statewide)
Original TEI
$149.3m
Current TEI
$149.3m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
0.0 months
Original: Jun 2027
→ Jun 2027
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata