Original TEI
$212.3m
Current TEI
$212.3m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
0.0 months
Original: Mar 2023 → Mar 2023
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.

Metadata