Public Housing Revitalisation Program (metropolitan)
Original TEI
$436.2m
Current TEI
$436.2m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
—
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata