North East Link Connections (Bulleen/Watsonia)
Original TEI
$2642.3m
Current TEI
$2642.3m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
0.0 months
Original: Dec 2028
→ Dec 2028
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata
The Commonwealth Government is contributing $5 billion to the North East Link program.