New youth justice facility (metropolitan)
Original TEI
$419.7m
Current TEI
$419.7m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
0.0 months
Original: Mar 2024
→ Mar 2024
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata