Original TEI
$271.1m
Current TEI
$274.9m
Cost Overrun
+$3.8m
+1.4%
Schedule Overrun
Original: Mar 2025
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.

Metadata