New metropolitan trains (statewide)
Original TEI
$985.9m
Current TEI
$985.9m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
15.0 months
Original: Dec 2026
→ Mar 2028
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata