Original TEI
$548.0m
Current TEI
$685.0m
Cost Overrun
+$137.0m
+25.0%
Schedule Overrun
17.9 months
Original: Dec 2025 → Jun 2027
Cost Status
Off Track
Time Status
Off Track
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.

Metadata

Replacement of myki ticketing system. $137m over original budget per ABC analysis.