Original TEI
$100.8m
Current TEI
$100.2m
Cost Overrun
$-0.6m
-0.6%
Schedule Overrun
0.0 months
Original: Jun 2026 → Jun 2026
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.