Metropolitan rail infrastructure renewal program (metropolitan various)
Original TEI
$970.8m
Current TEI
$941.8m
Cost Overrun
$-29.0m
-3.0%
Schedule Overrun
12.0 months
Original: Jun 2028
→ Jun 2029
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.