Metropolitan and regional restoration and maintenance (statewide)
Original TEI
$194.6m
Current TEI
$194.6m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
0.0 months
Original: Jun 2024
→ Jun 2024
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata