Metro Tunnel Readiness 2023-24 and 2024-25 (metropolitan)
Original TEI
$400.6m
Current TEI
$400.6m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
0.0 months
Original: Dec 2025
→ Dec 2025
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata
The TEI has increased by $8.514 million due to budgeted amounts being reclassified as capital instead of operating expenditure, in line with accounting standards.