[IT] HCI Replacement Project
Original TEI
$9.0m
Current TEI
$9.0m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
0.0 months
Original: Dec 2026
→ Dec 2026
Cost Status
On Track
Time Status
Unknown
Description
Hyper-converged infrastructure (HCI) utilises physical servers to create a software-defined IT environment that virtualises all components of traditional hardware-based systems.
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.