Original TEI
$3.4m
Current TEI
$3.4m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
0.0 months
Original: Jun 2025 → Jun 2025
Cost Status
On Track
Time Status
Unknown
Description

The project builds on the products delivered in previous phase of the Student Insight project by maintaining the operations and migrating functions and data to the Education Cloud.

Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.

Metadata