Original TEI
$4.2m
Current TEI
$4.2m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
1.6 months
Original: Aug 2025 → Oct 2025
Cost Status
On Track
Time Status
At Risk
Description

End of life replacement of network switches at Sunshine Hospital to ensure network reliability, supportability and security, enabling WH to deliver services for the future, high quality connected care and better health outcomes for our community.

Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.

Metadata