[IT] Blackburn SurgiNet, Anaesthesia and Device Integration Project
Original TEI
$2.7m
Current TEI
$1.5m
Cost Overrun
$-1.2m
-42.9%
Schedule Overrun
0.0 months
Original: May 2025
→ May 2025
Cost Status
On Track
Time Status
Unknown
Description
The Project extends the existing EMR Surginet, Anaesthesia Modules and device integration footprint from Box Hill extending to Blackburn Public Surgical Centre, enhancing patient outcomes through delivering consolidated workflows
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.