Original TEI
$2.8m
Current TEI
$2.8m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
4.0 months
Original: Jun 2025 → Oct 2025
Cost Status
At Risk
Time Status
At Risk
Description

The project will replace end-of-life hardware to maintain support for the network switch environment, enabling the organisation to minimise legacy system risks and improve security.

Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.

Metadata