[IT] Land Development System (easyACCESS) Replacement
Original TEI
$1.8m
Current TEI
$3.8m
Cost Overrun
+$2.0m
+114.7%
Schedule Overrun
—
Cost Status
Unknown
Time Status
Unknown
Description
Full replacement of the current easyACCESS Land Development portal with a Salesforce solution, before the portal reaches end of life
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata