[IT] WorksPortal System and Asset Creation Replacement
Original TEI
$4.6m
Current TEI
$4.7m
Cost Overrun
+$0.1m
+2.0%
Schedule Overrun
0.0 months
Original: Apr 2026
→ Apr 2026
Cost Status
On Track
Time Status
Unknown
Description
The current WorksPortal System is reaching end of life with support expiring by July 2026. As the system relates to asset creation and revenue, a replacement is required.
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata