[IT] Peninsula Health Project Phoenix (MePACS Refresh)
Original TEI
$3.0m
Current TEI
$3.0m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
0.0 months
Original: Oct 2025
→ Oct 2025
Cost Status
On Track
Time Status
Unknown
Description
A technology refresh of the core MePACS systems with a modern Customer Relationship Management System (CRM) to secure the ongoing viability of the MePACS business.
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata