Original TEI
$3.8m
Current TEI
$4.5m
Cost Overrun
+$0.6m
+16.2%
Schedule Overrun
0.0 months
Original: Dec 2027 → Dec 2027
Cost Status
At Risk
Time Status
Unknown
Description

The BASC Infrastructure Refresh project will deliver refreshed infrastructure to replace an end-of-life system that supports agricultural research. This project will be delivered in three phases over the next three years.

Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.