Original TEI
$8.0m
Current TEI
$8.0m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
15.2 months
Original: Sep 2026 → Dec 2027
Cost Status
On Track
Time Status
Off Track
Description

The project will migrate legacy student management system to new technology offered by the existing vendor to minimize technology risk and maintain student experience and business continuity.

Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.