[IT] FRV Operational Station Connectivity
Original TEI
$16.7m
Current TEI
$18.4m
Cost Overrun
+$1.7m
+10.4%
Schedule Overrun
37.6 months
Original: Jun 2023
→ Aug 2026
Cost Status
At Risk
Time Status
Off Track
Description
The implementation of the FRV network and FRV Station Turn Out systems across ex CFA stations.
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata