Original TEI
$3.8m
Current TEI
$4.4m
Cost Overrun
+$0.6m
+15.7%
Schedule Overrun
43.9 months
Original: Nov 2022 → Jun 2026
Cost Status
At Risk
Time Status
Off Track
Description

Purchase and implement a contemporary off the shelf Rostering and Shift Change system to replace multiple legacy systems.

Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.