Original TEI
$123.4m
Current TEI
$204.0m
Cost Overrun
+$80.6m
+65.3%
Schedule Overrun
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.

Metadata

The TEI has increased by $85.690 million due to reprioritisation and reprofiling of the program.