Information Technology - Infrastructure (Mitcham)
Original TEI
$123.4m
Current TEI
$204.0m
Cost Overrun
+$80.6m
+65.3%
Schedule Overrun
—
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata
The TEI has increased by $85.690 million due to reprioritisation and reprofiling of the program.