Original TEI
$102.6m
Current TEI
$102.6m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
0.0 months
Original: Dec 2026 → Dec 2026
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.

Metadata

The TEI has reduced by $12.990 million due to a revised project scope. This initiative is part of Labor’s Financial Statement 2022.