Hall Road Upgrade (Skye)
Original TEI
$282.2m
Current TEI
$282.2m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
0.0 months
Original: Mar 2026
→ Mar 2026
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata