Original TEI
$107.3m
Current TEI
$103.9m
Cost Overrun
$-3.4m
-3.2%
Schedule Overrun
0.0 months
Original: Jun 2028 → Jun 2028
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.

Metadata

The TEI has decreased by $7.862 million due to a revised project scope.