Original TEI
$236.4m
Current TEI
$279.9m
Cost Overrun
+$43.5m
+18.4%
Schedule Overrun
0.0 months
Original: Jun 2027 → Jun 2027
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.