Drainage and flood projects (statewide)
Original TEI
$116.2m
Current TEI
$692.3m
Cost Overrun
+$576.1m
+496.0%
Schedule Overrun
—
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata