Original TEI
$275.7m
Current TEI
$256.5m
Cost Overrun
$-19.2m
-7.0%
Schedule Overrun
Original: Dec 2025
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.